SECTORS
The sectors we detail and engineer for.
Eighteen sectors, each with its own constraints, standards and failure modes — and its own set of automated checks. What changes between them is not the marketing, it is the work.
Why sector changes the drawing
A slab is not a slab. In a hospital it is perforated by services that were designed after the frame; in a data centre it carries equipment loads that will change twice before handover; in a water treatment structure it is governed by crack width and cover rather than strength; in a metro box it is built inside a possessions programme where a late drawing costs a weekend.
Sector experience shows up in three concrete places: which questions get asked at intake, which automated checks are switched on, and how the drawing set is structured for the people who will read it on site. That is why these pages exist per sector rather than as one page with the noun swapped.
Buildings
Commercial buildings — repetitive frames, tenant fit-out change, and coordination with façade and services packages that arrive on different programmes.
Residential buildings — high repetition, tight tolerances between trades, and precast or modular strategies that only pay if the detailing is right first time.
Hospitals — dense services, strict clearances, phased construction inside a live estate, and validation regimes that make document control part of the engineering.
Schools — standardised designs, short programmes, and summer possession windows that leave no room for a re-issue.
Data centres — modular repetition, heavy plant support, and a change cadence that outruns conventional drawing production.
Industry and energy
Industrial buildings — long spans, craneage, and structures that have to accept equipment defined later by someone else.
Manufacturing plants — process-driven layouts, heavy foundations and plinths, and equipment supplier drawings that change after the frame is ordered.
Chemical plants — hazardous area constraints, pipe racks, containment structures, and a documentation standard that has to survive an audit.
Power plants — thermal, hydro, nuclear-adjacent and renewable, with turbine and generator support structures where stiffness and tolerance dominate.
Water and waste — liquid-retaining structures governed by crack width, cover and durability rather than capacity.
Defence — security-minded information management, hardened structures, and a delivery model where who can see what is part of the specification.
Transport and infrastructure
Bridges — plate girders, splices, camber, staged construction and fabrication tolerances that leave no room for interpretation.
Tunnels — segmental and cut-and-cover, heavily reinforced, with congestion resolved in the model before it is discovered in the shutter.
Metro — stations, boxes and viaducts, delivered against possessions and interface agreements with operators.
Roads — structures, retaining walls, gantries and drainage, produced as a controlled set across long linear projects.
Airports — phased work in live operations, long-span terminal roofs, and a coordination load that touches every discipline.
Public and specialist
Stadiums — geometry that has to be solved before it can be drawn, long-span roofs, and erection sequences that drive the detailing rather than follow it.
Theaters — acoustic and structural separation, complex raked geometry, rigging and technical loads, and heritage fabric to work around.
Each sector page sets out the deliverables, the standards that usually govern, the checks that matter most, and the services that typically make up a package for that kind of structure.
FAQ
Common questions
Do you work outside these eighteen sectors?
Yes. These are the sectors where the work is regular enough to have documented intake questions and configured check sets. Structures outside them are taken on the same way, with the intake step doing more work at the start to establish which standards, tolerances and checks govern.
Does sector experience actually change the deliverable?
It changes three things: which questions we ask before production starts, which automated checks are switched on, and how the drawing set is structured for the people reading it on site. A metro set built for possessions and a warehouse set built for speed are organised differently even when the steel is similar.
Can one team cover a project that spans sectors?
Yes, and mixed projects are common — a data centre with a substation, a hospital with a bridge link, an industrial site with roads and water structures. It runs as one engagement with one register, and the check configuration varies by package rather than by contract.